Temporary Fencing
Panels, Posts, Screen and Gates
Temporary Fence Rental for Construction and Events

Call with the address, the length of fence you need and your dates. Providers near the site quote panels or posts, screen, gates, installation and removal.

866-569-7816

Have the linear feet, the dates and the ground type ready

Temporary Fence Rental for Construction and Events

Most temporary fence jobs start the same way. A superintendent walks the site, sees the perimeter is open on two sides, and needs it closed by Monday. Here is what you are actually renting, so the phone call goes quickly.

Panels, posts and what holds them up

The standard product is a chain-link panel, usually six feet high and about ten feet wide, clamped to the next panel. On hard ground each panel sits on a weighted stand or a concrete block. On soft ground, crews may drive steel posts and hang the fabric on them. Panels are fast and can be moved when the work shifts. Driven posts hold steadier, and they make more sense on a long run that will stay put for months.

Six feet is what most construction sites and event perimeters get. Eight feet is for places where someone needs a harder time climbing over, like a materials yard, a demolition site or a vacant property that has already had a visitor. Crowd control barricades are a separate product. They are short, interlocking and meant to steer people, not keep them out.

Screen, gates and bracing

Privacy screen, sometimes called windscreen, is mesh fabric zip-tied to the fence. It cuts dust, hides equipment and keeps passersby from watching the work. It also catches wind like a sail, so a screened fence needs more bracing than a bare one.

Gates come in two types. A pedestrian gate lets workers and inspectors through. A vehicle gate, single or double swing, lets trucks in. Tell the provider where trucks will enter and how wide they are, because moving a gate after the fence is up costs a crew visit.

Bracing means angled supports, extra weight at the stands or posts driven deeper. If your site is open, elevated or next to a road where trucks make their own gusts, ask for it by name.

Install, rental period and removal

A crew delivers the panels, sets them along your layout, clamps them, hangs the gates and screen, and checks the run. Removal is a second visit at the end. Rentals are usually billed monthly, and a project that runs long keeps the fence up at the same rate until you call it off. Say when you think the work ends, then add a cushion. Construction schedules slip.

What moves the quote

  • Linear feet. The length of the run is the biggest factor.
  • Gates. Each one adds hardware and labor.
  • Screen. Fabric across the whole run adds material and bracing.
  • Duration. A longer rental means more months billed.
  • Ground. Asphalt takes stands. Dirt, gravel and slopes may need posts, which means more install time.

Who rents it

General contractors and developers fence perimeters to meet site security requirements. Demolition and utility crews close off open excavations. Event organizers set up queues, VIP areas and parking lot edges. Property managers use fence after storm damage or to close up a vacant building, and a restaurant or retailer may need a short run during an exterior remodel. All of it is jobsite and event work.

Details to gather before you call

  • The site address, and where the fence should run.
  • The approximate length, or a site plan if you have one.
  • The start date and how long you expect to keep the fence.
  • Screen, gates or both.
  • The surface, and anything that blocks a truck from getting close.

Have those five answers and you can usually get a quote in one conversation.

Frequently Asked Questions

Should I rent panel fence or post-driven fence?

Panels on stands are the default for most jobs. They go up quickly, come down quickly and can be moved if the site layout changes. They work best on pavement or firm ground.

Driven posts are better when the fence runs a long time, sits on soft ground or carries screen. The crew spends longer on install and removal, but the fence stays put. Tell the provider the surface and how long you need it, and ask which one they would pick and why.

What heights does temporary fence come in?

Six feet is the common height for construction perimeters and event boundaries. It is tall enough to stop casual entry, and every provider stocks it.

Eight feet is available for sites where extra height matters, such as material yards, demolition and vacant properties that have been entered before. Shorter crowd control barricades are a different product, built to guide people rather than block them. If you are unsure, describe the site and the risk and let the provider recommend.

Do I need privacy screen on the fence?

Not always. Screen is mesh fabric attached to the panels, and it is worth having when dust, noise or sightlines matter. Sites next to a road, a school or a business often use it. It also hides equipment from view.

The tradeoff is wind. A screened fence acts like a sail, so it needs more bracing than a bare one. If you want screen, say so up front so the provider prices the extra weight or posts. Adding it later usually means a second visit.

Can a temporary fence have gates?

Yes. A pedestrian gate lets workers, inspectors and deliveries on foot get through. A vehicle gate, in a single or double swing, lets trucks and equipment enter. Many sites have one of each.

Location matters. Moving a gate after the fence is up means another crew visit, so decide where trucks will enter and how wide they are before the install. Gates also need to latch and lock if the fence is there for security. Ask what hardware the provider supplies, and who keeps it closed.

How long does installation take?

A short run on pavement can go up in a few hours. A long perimeter, a run with screen or a site with posts to drive takes a day or more. Delivery timing depends on the provider and how busy they are, and a fence in place within a few days of the call is common.

Ground, access and gates all change the timeline. If your start date is firm, call as soon as you know it and say so. Removal at the end is a separate visit, so plan for that too.

Will a temporary fence hold up in wind?

It can, if it is set up for the conditions. Bare chain-link lets wind pass through, so it handles gusts better than most people expect. Screen is the issue, because the fabric catches wind and loads every panel and stand.

Providers brace for this with extra weight on the stands, angled supports or posts driven into the ground. Open sites, hilltops and spots beside truck routes need the most. Tell the provider about the location and any screen you want, and ask how they will brace it.

Articles

Temporary fencing by city

Pick your city for install notes, wind and ground conditions, and what to ask a fence company there.

Call for a quote
866-569-7816 Weekdays, usually answered within a minute
Alluvit BBB Business Review